Dec 7, 2024
We have recently seen quite a few “shed” or “outbuildings” being constructed that have not been approved by the Architectural Control Committee. As a reminder, any shed or outbuilding needs to be approved by the ACC prior to starting any construction.
In order to determine requirements for ACC approval, please review the most recent CC&Rs that have been posted to our Bristol Heights Website.
Below are a few of the main violations that we have been seeing, other than simply NOT submitting an ACC application. Please note that these call outs are NOT an exhaustive list of requirements. It is your responsibility to review our CC&R's to ensure that your ACC Application is complete.
Section 15. "Setbacks" - No building shall be located on any Lot nearer than twenty (20) feet from the front line and fifteen (15) feet from the rear line nor nearer than five (5) feet to any side line. On comer Lots, no building shall be located nearer than twenty feet (20') from the side street line.
Section 21. "Outbuildings" - Only one outbuilding per Lot will be allowed. No outbuildings shall be larger than one hundred fifty ( 150) square feet. All outbuildings shall be constructed of quality building material, completely finished and painted on the outside, and shall be of the same siding, roofing, and colors as the house, All outbuildings must be approved by the Architectural Control Committee.
Instructions on how to submit an ACC request can be found using your Community Pro Portal.
https://www.accesssentrymgt.com/dx/sentrywp/index.html
You can also reach out to Boise Sentry directly for assistance.
boise@sentrymgt.com or (208) 323-1080.
Thank you for your help.
Bristol Heights Board of Directors